Rykneld School, Branston

  • Rykneld School
  • Rykneld School Classroom
  • Rykneld School
  • Rykneld School Library
  • Rykneld School Teapoint
  • Rykneld School Access. WC

About This Project

Rykneld School

Mechanical Works

Our work here at Rykneld School involved a full design and delivery of mechanical services. This is including production of the Thermal Model, SBEM calculations, Log Book, and EPC certificate.


There was installation of:

  • Incoming gas and water services to the new building.
  • Boiler plant room.
  • LTHW radiant panels and pipework distribution.
  • Gas fired Ambi Rad system to Sports Hall.
  • AHU with associated ductwork.
  • VAV and CAV boxes.
  • Toilet extract system.
  • Public health services.
  • AC to ICT suite and Server Room.
  • Gas proving system to DT/Food Classroom.
  • BMS controls.


Electrical Works

The electrical works for Rykneld School involved the full design and delivery of electrical services to the new build school.
Installation of :

  • Upgraded the incoming electrical supply (existing building).
  • New supply between the new and existing building.
  • New LED lighting.
  • Fire Alarm.
  • Door Access.
  • Intruder Alarm.
  • Structured Cabling.
  • Solar PV Array systems.
  • New LV Switchboard and loose distribution boards to serve the small power and lighting in the new building.


Examples of Equipment Used


Project Duration

30 weeks

Project Value


Main Contractor

Morgan Sindall

Electrical Works, Mechanical Works
electricalworks, mechanicalworks, morgansindall